For 400A residential or light commercial service, typical conduit is 3-inch EMT/IMC/RMC with 600 kcmil copper or 4/0 parallel runs.
For a 400-amp service entrance, conduit sizing depends on whether you use single 600 kcmil conductors or parallel 4/0 sets:
| Conductor configuration | Cu vs Al | Conduit per raceway |
|---|---|---|
| Single 600 kcmil per phase + neutral | Copper | 3-inch EMT/IMC/RMC |
| Single 600 kcmil per phase + neutral | Aluminum | 3-1/2 inch |
| 2 × parallel 4/0 sets per phase + neutral | Copper | 3-inch (single raceway with 6 conductors) |
| 2 × parallel 250 kcmil sets per phase + neutral | Aluminum | 3-inch+ |
Single 600 kcmil copper THHN for 400A (NEC 310.16)
| Variable | Value |
|---|---|
| 600 kcmil THHN area | 0.8676 in² |
| 3 conductors (no EGC in service entrance) | 2.603 in² |
| 40% fill required interior | 6.508 in² |
| 3" EMT (8.846 in²) | 29.4% fill ✓ |
Parallel 4/0 copper for 400A (NEC 310.10(H))
Two parallel sets per phase. Each set must be:
- Identical length, gauge, insulation, terminations
- ≥ 1/0 minimum gauge
6 phase conductors + 2 parallel neutrals = 8 conductors of 4/0 in the raceway. 8 × 0.3237 = 2.590 in² → 29.3% fill in 3" EMT. Fits.
Aluminum 400A (NEC 310.16, 600 kcmil Al)
600 kcmil aluminum at 75°C = 380A — insufficient for 400A. Step to 700 kcmil aluminum at 75°C = 400A.
700 kcmil aluminum is unusual stocking; many installs use 2 parallel sets of 250 kcmil aluminum instead: 2 × 215A at 75°C = 430A.
Two sets of 250 kcmil aluminum × 3 phases = 6 conductors. 6 × 0.4596 (250 kcmil aluminum THHN) = 2.758 in² → 31.2% fill in 3" EMT.
Underground service lateral
For 400A laterals, the typical setup:
- 3-1/2 inch PVC Sch 80 above grade for the riser (where exposed to physical damage)
- 3-inch PVC Sch 40 below grade in trench
If using 600 kcmil aluminum in Sch 80 risers, jump to 4-inch Sch 80 to clear the 40% margin (600 kcmil Al × 3 = 1.379 in² × 3 = 4.137 in² > 40% of 6.442 in² = 2.577 in² — over).
Local AHJ considerations
400A is at the boundary of residential/light commercial. Many AHJs require:
- Separate raceway per phase (parallel install) for ampacity adjustment relief
- IMC or RMC for the riser (not EMT) for added physical protection
- Bonding bushings at every metallic fitting
Quick reference
- Standard service raceway: 3-inch EMT or IMC for 400A copper
- Aluminum: 3-1/2 inch or 4-inch
- Parallel 4/0 Cu: 3-inch EMT (single raceway, 6 conductors)
- Underground: PVC Sch 80 above, Sch 40 below
For commercial 400A feeders with multiple sets, use the conduit fill calculator.
FAQ
RELATED TOOLS
This page's figures are transcribed from NEC 2023 (NFPA 70) Chapter 9, Tables 1, 4 and 5, and checked by a version-controlled automated test suite — they are not signed off by a licensed professional. WireFillChart is an independent reference, not affiliated with or endorsed by NFPA. Always verify against the code edition adopted by your local authority having jurisdiction (AHJ).